|
Callout |
Component Name |
|---|---|
|
Preliminary Procedure
Remove the instrument panel insulator, if equipped. |
|
|
1 |
Blower Motor Resistor Screw (Qty: 2) Caution: Refer to Fastener Caution. |
|
2 |
Blower Motor Resistor Procedure
Disconnect the wiring connector. |
Heater and Air Conditioning Evaporator and Blower Module Removal and Installation
HeatingPositive Crankcase Ventilation Pipe Removal
Open the 2 positive crankcase ventilation pipe retainer clips (2) and (3).
Note: Move retainer clamp (1) in direction of the arrow.
Remove the positive crankcase ventilation pipe from the intake manifold.
Loosen the charger air bypass val ...
Intake Manifold Tuning Valve Actuator Replacement
Intake Manifold Tuning Valve Actuator Replacement
Callout
Component Name
Preliminary Procedure
Properly raise and support the vehicle. Refer to Lifting and Jacking
the Vehicle.
1
Intake Manifold ...
Charge Air Cooler Replacement
Charge Air Cooler Replacement
Callout
Component Name
Preliminary Procedures
Disconnect the negative battery cable. Refer to Battery Negative
Cable Disconnection and Connection.
Raise and properly support the vehicle. Refe ...