Callout |
Component Name |
---|---|
Preliminary Procedures
|
|
1 |
Heater Core Tube Cover Bolt (Qty: 2) Caution: Refer to Fastener Caution. |
2 |
Heater Core Tube Cover |
3 |
Heater Core Tube Clamp (Qty: 2) |
4 |
Heater Core Tube Rear Cover Bolt |
5 |
Heater Core Tube Rear Cover |
6 |
Heater Core Tube Note: Heater Core tubes are serviced as a kit . |
Door Lock Switch Replacement
Door Lock Switch Replacement
Callout
Component Name
Preliminary Procedure
Remove the heater and air conditioning control. Refer to
Heater and Air Conditioning Control Replacement.
1
Door Lock ...
Tire Dismounting and Mounting (Match Mounting)
Match mounting is required on any wheel/tire assembly not within RFV specification.
Important: If a wheel/tire assembly is not within the RFV specification
after match mounting, the tire must be returned to the tire manufacturer.
All wheel weights should be removed prior ...
Tire and Wheel Assembly-to-Hub/Axle Flange Match-Mounting
Note: After remounting a tire and wheel assembly to a hub/axle flange,
remeasure the tire and wheel assembly on-vehicle runout in order to verify that
the amount of runout has been reduced and brought to within tolerances.
Mark the location of the high spot on the tire and wheel asse ...