Callout |
Component Name |
---|---|
1 |
Air Conditioning Evaporator Hose Assembly Nut. Caution: Refer to Fastener Caution.
22 Y (16 lb ft) |
2 |
Air Conditioning Evaporator Hose Assembly Procedure
Discard and replace all sealing washers. Refer to Air Conditioning System Seal Replacement. |
Headlamp Aiming
Visual Aiming Preparation Procedure
Note: Some state and local laws specify requirements for headlamp
aim. Comply with all of these laws when performing any headlamp aiming operations.
Headlamp aim should be checked:
When a new headlamp capsule is installed.
If ser ...
Quarter Inner Trim Finish Panel Replacement (Hatchback)
Quarter Inner Trim Finish Panel Replacement
Callout
Component Name
Preliminary Procedures
Remove the rear side door opening floor carpet retainer. Refer to
Rear Side Door Opening Floor Carpet Retainer Replacement.
Remove ...
Clutch System Description and Operation
Clutch Spin Down Time
Inspect the clutch spin down time as follows:
Apply the parking brake and block the vehicle wheels.
Shift the manual transmission into NEUTRAL.
Start the engine. Run the engine at idle speed.
Engage the clutch.
Disengage the clutch. Wait 9 seconds.
...