Callout |
Component Name |
---|---|
Preliminary Procedure
|
|
1 |
Fuel Rail |
2 |
Fuel Injector |
3 |
Fuel Injector Seal Ring |
4 |
Fuel Injector Retainer Clamp |
Heater Inlet Hose Replacement (LUV)
Heater Inlet Hose Replacement
Callout
Component Name
Preliminary Procedures
Drain the engine coolant. Refer to Cooling System Draining and Filling.
Remove the charge air cooler outlet hose. Refer to Charge Air Cooler
...
Intake Manifold Replacement (LDE)
Removal Procedure
Disconnect the negative battery cable. Refer to Battery Negative Cable
Disconnection and Connection.
Remove the throttle body assembly. Refer to Throttle Body Assembly Replacement.
Disconnect wiring harness plug.
Disconnect the pipes from ...
Timing Belt Center Front Cover Replacement
Timing Belt Center Front Cover Replacement
Callout
Component Name
Preliminary Procedure
Remove the timing belt upper front cover. Refer to Timing Belt Upper
Front Cover Replacement.
Remove the engine mount bracket. Refer ...