Callout |
Component Name |
---|---|
Preliminary Procedures
|
|
1 |
Rear Wheel Bearing/Hub Mounting Bolt (Qty 4) Caution: Refer to Fastener Caution. Procedure
Remove the electrical connector for the rear wheel speed sensor. Tighten
58 Y (43 lb ft) |
2 |
Rear Wheel Bearing/Hub Assembly Procedure
Ensure that the rear wheel bearing/hub is properly aligned with the rear axle to allow access to the wheel speed sensor connector. |
Instrument Panel Upper Compartment Door Latch Replacement
Instrument Panel Upper Compartment Door Latch Replacement
Callout
Component Name
1
Instrument Panel Upper Compartment Door Latch
Procedures
Open the instrument panel compartment door.
Unsnap the instrument com ...
Differential Carrier Removal (6T30)
Differential Carrier Removal
Callout
Component Name
1
Differential Carrier Assembly
2
Final Drive Sun Gear
...
Front Differential Carrier Installation (6T40/45/50)
Front Differential Carrier Installation
Callout
Component Name
1
Final Drive Sun Gear
2
Differential Carrier Assembly
3
Front Differential Carrier Bearing Asembly
...