Callout |
Component Name |
---|---|
1 |
Roof Rail Front Assist Handle Fastener (Qty:?€‰2) Caution: Refer to Fastener Caution.
6?€‰Y?€‰(53?€‰lb?€‰in) |
2 |
Roof Rail Front Assist Handle Assembly |
Front Side Door Lock Cylinder Coding (Non Free Wheeling)
The door lock cylinder uses 8 of the 8 cut positions. The tumbler positions are
staggered from side to side, 4 on one side and 4 on the other, are not self-retaining,
and are not snap in.
Note: All lock cylinders for side milled keys have right and left
tumblers. The locat ...
Front Camber Adjustment
Note: DO NOT grind the front strut bores for the bolts to allow
adjustment of the front camber. There are service bolts available to allow
the front camber to be adjusted, if needed.
If the front camber is out of specifications, perform the following:
Remove the f ...
Secondary Air Injection Pump Replacement
Secondary Air Injection Pump Replacement
Callout
Component Name
1
Secondary Air Injection Pump Inlet Pipe
Note: Squeeze the retainer on opposite sides to release.
2
Secondary ...